Skip to content

Dubai, United Arab Emirates

+971 50 236 9230 +971 50 934 1171
EN العربية
ALS Building Contracting
+971 50 236 9230 Get a price for your job

Manpower services

The crews we send you are the crews we build with

We are a building contractor. We employ twelve trades to build our own jobs, which means we run a standing workforce rather than a database. When your site needs those trades, we send the same people, and we know what each of them can actually do because we have watched them work.

Trade, number of workers, site and start date is enough to begin.

A crew of tradesmen working on a large site

Same crews

our sites and yours

Twelve trades, one payroll

The trades we supply

Structure and shell

  • Block Mason
  • Steel Fixer
  • Carpenter

Surfaces

  • Plasterer
  • Gypsum Installer
  • Tile Mason

Services

  • Electrician
  • Plumber
  • HVAC Technician

Finishing and support

  • Painter
  • MEP Technician
  • General Helper

Need a trade that is not on the list? Ask. We will tell you straight whether we have it. Single trades, full crews, or a crew with its own foreman.

  • Block Mason
  • Steel Fixer
  • Carpenter
  • Plasterer
  • Gypsum Installer
  • Tile Mason
  • Electrician
  • Plumber
  • HVAC Technician
  • Painter
  • MEP Technician
  • General Helper
  • Block Mason
  • Steel Fixer
  • Carpenter
  • Plasterer
  • Gypsum Installer
  • Tile Mason
  • Electrician
  • Plumber
  • HVAC Technician
  • Painter
  • MEP Technician
  • General Helper

The whole difference

We have seen these men work. That is the whole difference.

A manpower company that does no construction of its own knows its workers the way a recruiter knows a candidate: from a document and a short conversation. It finds out whether a tiler can tile at the same moment you do, which is on your site, on your programme, at your cost.

We find out on ours. Every trade we supply works on our own contracts as well as on yours, under our own supervision, to a standard we have to answer for as the contractor. When we tell you a plasterer is good, it is because we have had him on a job where our name was on the handover.

The second difference is what happens when someone does not work out. A broker's answer is that he is only the agency. Ours cannot be, because the man goes back onto our own site and we still have him.

Tradesman on site beside the installation he has just made

Tested on our jobs before he is sent to yours.

Four steps

From your call to men on site

  1. 01

    You tell us what you need

    Trade, number of workers, site location, start date and expected duration. If you have a programme, send it: it changes what we recommend.

  2. 02

    We tell you what we have

    Who is available, from when, and at what rate. If we cannot cover something we say so at this point rather than after you have committed. Usually within four working hours, and the same day at the latest.

  3. 03

    Paperwork and mobilisation

    Agreement, site induction, safety documentation and access passes for your building or community. We carry the labour contracts, the insurance and the MoHRE filings. Building access passes are raised in your name, because the building issues them to the occupier and to nobody else.

  4. 04

    On site, with someone answerable

    The crew works to your programme and your site rules. One named contact on our side for the whole engagement.

In the agreement, before the first man arrives

What you can hold us to

Every item below goes into the agreement before the first man arrives. None of it is unusual. What is unusual is publishing it, and we publish it because we have no track record to publish instead.

Replacement
If a worker cannot do the work he was sent for, we replace him and you do not pay for the days he was there. Replaced within two working days, the days he was there uncharged, and no cap on replacements in the first two weeks of an engagement.
Notice both ways
You can release a worker and we can withdraw one, with the same notice on both sides. Three working days.
No minimum you did not agree to
You pay for the days worked against signed timesheets, not for a block you were talked into. Five working days is the minimum engagement. There is no minimum headcount: one man is an order.
Timesheets signed on site
Hours are signed by your supervisor before they are invoiced. No reconciliation arguments at the end of the month.
Rates fixed for the engagement
The rate agreed at the start is the rate for the agreed period. Changes are written and agreed before they apply, not applied and then explained. A rate holds for ninety days from the signed rate sheet.
One named contact
One person on our side for the whole engagement, named in the agreement. If he changes, you are told.
Safety and equipment
We provide PPE, workwear, hand tools and our own safety induction. Power tools, consumables, scaffolding and any site-specific induction are yours, and the rate sheet says which is which line by line.

Four variables

What a rate depends on

We will give you a rate per trade per day when we know what the work is. What we will not do is publish a table, because every number in it would be wrong for half the enquiries that read it.

Trade and skill level

A tile mason setting large-format stone and a tile mason doing a bathroom are priced differently, and pretending otherwise is how you end up with the second man on the first job.

Duration and continuity

A crew booked for three months costs less per day than four men for a week. Mobilisation is a real cost and it does not amortise over five days.

Hours and shift pattern

Standard hours, overtime, night work and weekend working are priced separately and stated separately, so you can see what a schedule change costs before you make it.

Site and access

A tower with a booked hoist and a community with restricted working hours are different jobs for the same trade. Access rules are worth telling us about at the enquiry stage.

Tell us the trade, the numbers, the site and the dates. You get rates and availability back, not a brochure.

Said out loud

What we do not do

Trades that are not on our list. We would rather tell you we do not have a scaffolder than send you someone who has watched one.

Numbers we cannot cover. If you need forty men on Sunday, we will say so on the call rather than confirming and then managing your expectations downward.

Supervision of your own work. We supply trades to work under your site management. If you want somebody to take responsibility for the finished work rather than for the labour, that is a subcontract, and we do those too, on the construction side of the business.

Two different things

Not sure whether you need trades or a contractor?

Two different things, and the difference is who is answerable for the finished work.

You direct them

Manpower means you get people

You direct them, you supervise them, and the result is yours. It suits a site that already has management and needs hands, or ongoing maintenance where the work is continuous.

We answer for it

A contract means you get a result

We price the work, we supervise it, we answer for it, and you sign it off at the end. It suits a defined job with a start and a finish.

Tell us what you are trying to get done and we will tell you which one costs you less. Sometimes it is the second one even though it looks dearer.

Questions

Frequently asked

Not on the list? Ask it on WhatsApp and a person answers.

WhatsApp us
01Are these your own employees?

Yes. They work on our own construction contracts as well as on our clients' sites, under our own supervision.

02What happens if a worker is not up to the job?

We replace him and you do not pay for the days he was there. The terms are in the agreement before anyone arrives. Two working days to replace, and the days he was there are not charged.

03Who supervises them on my site?

You do, unless you ask us for a crew with its own foreman. We supply trades to work under your site management. If you want somebody answerable for the finished work instead, that is a subcontract, and we do those as well.

04How quickly can you mobilise?

It depends on the trade, the number and the time of year, and we will give you a real date on the call rather than a comfortable one here. Three to five working days for most trades, and longer through October and November when every site in Dubai is mobilising at once.

05What is the minimum engagement?

Five working days, and one man. No headcount floor and no monthly block you have to buy into.

06Do you supply trades outside Dubai?

No. Our licence and our crews are in Dubai. Supplying labour on somebody else's licence is the kind of shortcut that ends with your site shut, and it is not a favour we will do you.

07How am I invoiced?

Against timesheets signed by your supervisor on site, so the hours are agreed before they are billed rather than argued about afterwards. Invoiced every two weeks, payable in fourteen days.

Request trades

Tell us what trades you need

Trade, number of workers, site location, start date and roughly how long for. You get availability and rates back from a person who knows what these men can do, because they work on our jobs too.

For example: four tile masons and two helpers, six weeks.

Start here

Start your construction job with us today

Get a price for your job